References

Proven in service, on real networks.

From a completed contract on Portuguese railways to reviewed surveys of Spanish streets and motorways: what was captured, what was delivered, and the numbers behind it.

Rail

Onboard corridor inspection in scheduled service

Comboios de Portugal (CP) and Infraestruturas de Portugal (IP)

RailEyes camera units retrofitted on scheduled trains captured the corridor during normal service. Footage was anonymised on board, vegetation was detected along the track, and anonymised still frames every 50 to 100 m replaced full-length video for targeted corridor review.

Contract
Completed paid contract
Distance
More than 1 million km of scheduled service with RailEyes units on board
Rolling stock
Alfa Pendular (CPA 4000) and UTE 2240 series
Period
18 months of pilot and monitoring
Data
About 6 TB processed on the devices

RailEyes for Rail →Vegetation monitoring →

Front of a CP Alfa Pendular train with a RailEyes camera unit at the top of the windscreen.

Smart Cities

Street condition, signs and the map, on seven streets

RailEyes drive · València and Castelló de la Plana, Spain

One drive, analysed end to end: anonymised at capture, calibrated, analysed, every finding reviewed and placed on the map as a case. The same format is delivered to authorities taking part in the Smart Cities Programme.

Date
23 October 2026
Locations
7 streets in València and Castelló
Surface damage
37 cracks registered, 224 m in total; a reviewer confirmed all 37
Signs
A 40 km/h sign with 8 stickers on its red ring, flagged for maintenance
Map check
3 assets agree with OpenStreetMap; 2 mismatches flagged
Privacy
215 people and every visible number plate anonymised at capture

Smart Cities Programme →Surface damage →

Crack register for Plaça de Saragossa: the street from above with numbered pins and case cards.

Roads & Highways

A corridor survey from a single patrol pass

RailEyes drive · A-4 Autovía del Sur, Spain

One pass of an ordinary vehicle at motorway speed, rebuilt into top-down imagery aligned on the lane markings, with a straight-line diagram of defects, graded sections and ride jolts.

Date
October 2026
Defects
12 measured, each with type, area, lane and chainage
Condition
Graded in 20 m sections; worst section 14 % of the carriageway damaged
Ride
A jolt of about four times the normal shake, located on the route

RailEyes for Roads & Highways →Corridor surveys →

Straight-line diagram of the A-4 corridor with defects, graded 20 m sections and the ride profile.